What are the Main Types of Scaffolding in Construction?

IMG_2538-1-scaled.jpg (2560×1227)

There are three commonly Home scaffolding used forms of scaffolding. These are:

Fixed scaffolding.
Mobile towers.
Low level mobile towers and podium steps.


Fixed Scaffolding
Fixed scaffolding is what is commonly seen on buildings or other structures. In the UK ‘tube and fitting’ scaffolding is commonly used. This consists of individual tubes and fittings, such as couplers, along with scaffolding boards and toe boards and other protection such as brick guards.

There is also a wide variety of proprietary scaffolding systems. These are either in the form of separate components such as proprietary designed tubes with connectors or as modular systems, consisting of individual sections that are connected together.

There are also specialised forms of scaffolding such as cantilever or suspended scaffolding.

Design of fixed scaffolding

In all cases, those managing and working on the erection, dismantling or alterations of scaffolding must be competent. In many cases, specialist companies or scaffolding providers carry out any work that requires substantial scaffolding structures and each scaffolding project is individually designed.

For tube and fitting scaffolding design in the UK, there is guidance for standard design configurations for tube and fitting scaffolding. It can be found in the National Access and Scaffolding Federation (NASC) guidance book TG20 – ‘A comprehensive guide to good practice with tube and fitting scaffolding’. This guidance is important for those engaged in planning and carrying out the erection, alteration and dismantling of the standard designs of tube and fitting scaffolding.

For proprietary systems or modular scaffolding equipment, the manufacturer draws up the designs and issues erection guidance which needs to be followed.

For all types of scaffolding that are outside of the standard designs in TG20 or in the manufacturers’ instructions, then a competent person should carry out the design. Examples of these types of fixed scaffolding include suspended or cantilever scaffolding that are not to standard design, or other specialised scaffolding, such as shoring structures.

It is essential that a copy of the erection plan, standard or specialised, is available to those supervising and erecting scaffolding and that they are informed and instructed in its requirements. The next section will consider the safe erection of scaffolding.

The safe erection, alteration and dismantling of fixed scaffolding

As already mentioned, scaffolding can only be erected, significantly altered or dismantled under the supervision of a competent person and by those who have received training in the specific type of scaffolding.

The Construction Industry Scaffolders Record Scheme (CISRS) and CISRS Card is recognised as evidence of training that is suitable for the type of scaffolding that the card specifies. Scaffolding equipment manufacturers and independent training companies also offer specific training on different types of scaffolding equipment.

Often workers are employed to act as ‘scaffolding labourers’. These personnel should only ever assist trained erectors and should remain in a safe place, either on the ground or on a permanent structure, or on a fully erected platform with guardrails and toe boards.

It is essential that there is a safe method of erecting any type of scaffolding. The NASC has produced guidance, ‘Preventing falls in scaffolding operations’ and manufacturers also produce detailed guidance on how to safely erect and dismantle their equipment.

Supervision by a competent trained person must be available at all times. This means that, during work, a fully trained scaffolding erector, or erectors, are on site at all times. For larger or more complex operations, a supervisor should be on site or regularly visiting, depending on the complexity of the scaffolding and the nature of the site.

It is essential that any scaffolding that is left incomplete (for example, at the end of a working day) is made safe. Any ladders or other access must be removed and stored or secured so that they cannot be used by others. Warning signs should be posted – for example, ‘incomplete scaffolding’. Physical barriers should also be put into position. There have been fatal accidents to children and others who have entered building sites or scaffolding when it is incomplete.